BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
BEGIN:VEVENT
ORGANIZER;CN='8th ECIC & 9th ICSTI 2022':MAILTO:info@ecic-icsti.com
LOCATION:Room „Focke Wulf“
SUMMARY:Integrated steel plant strategic planning – an extension of coke production modelling in the m.simtop process integration platform
DESCRIPTION:Iron and steel making requires a wide range of different raw materials significantly influencing process performance which demands a continuous optimisation of process routes also with respect to energy efficiency as well as environmental emissions. Steadily changing raw material prices and qualities, market situations and product variations are challenging integrated steel plant operators in production planning and cost optimization. Primetals decided to develop a comprehensive metallurgical flow sheet model library for simulation and optimization of integrated steel plants. Intensive development efforts were taken in order to migrate existing well-established calculation and engineering routines as well as integrate newly developed models. The generated model library enables the setup of mass and energy balances for integrated steel plants, development and evaluation of new process concepts as well as investigations on impacts of raw material changes and trace material distributions. Recently coking plant operation data of an European coke producer was evaluated and based on a wide literature study predictive models for CRI, CSR, I10 and I40 developed. In a new approach the models were incorporated in a global mathematical optimization routine for strategic operations planning of integrated steel plants. Insight will be given on the models for prediction of coke parameters and its influence of overall operation optimization.
CLASS:PUBLIC
DTSTART:20220901T085500
DTEND:20220901T092000
END:VEVENT
END:VCALENDAR
